Smart Metering Instruments
Hangzhou Jingda Electronics
Robotic Palletizing and Depalletizing with Pallet Storage and Multi-Floor Delivery
Hangzhou · Founded in 1994
- Increase in storage volume
- 50%
- Reduction in warehouse staffing
- 5people
- Improvement in peak labor productivity
- 100%
The challenge
Preparing assembly materials across floors
Electronic components need coordinated storage, preparation and transfer between floors. The project links these operations to support complete assembly kits.

The solution
Integrated pallet storage and robotic handling
Double-deep pallet stacker cranes work with a robotic palletizing and depalletizing workstation. ERP and MES integration connects the system with cross-floor material delivery.

Project configuration
- Stacker cranes and workstations
- 2 double-deep pallet stacker cranes; 2 sets of workstations
- Robotic pallet handling
- 1 robotic palletizing and depalletizing workstation
- Palletizing and depalletizing performance
- 8 seconds/box cycle time; 200% efficiency improvement
- System integration
- ERP and MES integration with cross-floor delivery