Cosmetics ODM
Sinno Cosmetics
Finished Cosmetics Storage and Peak-Demand Order Fulfillment
Zhongshan · Founded in 2003
- Storage height utilized
- 12m
- Uses the available high-bay capacity to improve warehouse space utilization.
- Meets and exceeds Double 11 peak requirements for delivery times and order volumes.
The challenge
Meeting Double 11 fulfillment demands
Finished cosmetics storage and shipping must support the order volumes and delivery-time requirements of the Double 11 peak. The project connects warehouse capacity with automated handling.

The solution
High-bay storage linked to palletizing and transport
Pallet stacker cranes use 12 m of storage height, while a palletizing robot and FMR forklift robots connect storage and transport. ERP and MES integration supports peak-demand fulfillment.

Project configuration
- Stacker cranes and workstations
- 4 pallet stacker cranes; 4 pallet workstations
- Robotic handling
- 2 FMR forklift robots; 1 palletizing robot system
- Storage height
- 12 m high-bay storage connected with warehouse handling
- System integration
- ERP and MES integration supporting peak-demand fulfillment