
All case studies
Textile Fabrics
Shengzhou Bofeite Textile
Automated Yarn and Fabric Handling Across Floors
Shengzhou · Founded in 2021
- Phase 1 staffing optimizationReported as staffing optimization in the Phase 1 project.
- 3people
- Connects receiving, storage and shop-floor material preparation.
- Automatic freight elevator coordination reduces manual transfers between floors.
The challenge
Moving textile materials between floors
Raw-material receiving, storage and shop-floor preparation require heavy loads to move between floors. Phase 1 connects these operations to reduce manual handling requirements.

The solution
Continuous material flow through elevator coordination
Underride AGVs and an underride forklift coordinate automatically with a freight elevator. ERP integration supports batch-based material supply from receiving through shop-floor preparation.

Project configuration
- Transport equipment
- 2 underride AGVs; 1 underride forklift
- Elevator coordination
- Automatic coordination with 1 freight elevator
- Connected processes
- Continuous flow between receiving, storage and shop-floor material preparation
- System integration
- ERP integration with batch-based material supply