All case studies
Electromechanical Manufacturing
EDON
21-Meter High-Bay Pallet Storage and Kitted Component Supply
Wenling
- Space utilization improvement
- 2×
- Storage density increase
- 60%
- Warehouse staffing reductionPhase 1.
- 30%
The challenge
Coordinating large and small components
The project brings large and small components into coordinated storage and work-order-based material preparation for production.

The solution
High-bay pallet storage with CTU tote handling
A 21 m high-bay pallet warehouse works alongside CTU tote storage to supply component kits. Unique tote barcodes and automated first-in, first-out operations are integrated with ERP and MES.

Project configuration
- Automated storage equipment
- 3 pallet stacker cranes and 3 CTUs
- Workstations and conveying
- 2 workstations and 1 sorting conveyor line set
- Storage and identification
- 21 m high-bay storage with a unique barcode for each tote
- Control and integration
- Automated first-in, first-out operations; ERP and MES integration