
All case studies
Rotomolded Products and Equipment
BST Technology
Assembly Parts Storage and Kit Delivery Across Floors
Wenling
- Piece-picking outbound throughput
- 70totes/h
- Warehouse and handling workforce optimizationPhase 1.
- 50%
The challenge
Preparing assembly kits across floors
The project coordinates storage, sorting and cross-floor supply for approximately 3,000 types of small assembly components.

The solution
CTU storage with AMR and elevator coordination
CTUs retrieve totes for sorting, while underride AMRs and automatically coordinated freight elevators deliver materials across floors. ERP integration connects storage and material supply.

Project configuration
- Robotic handling
- 2 CTUs and 2 underride AMRs
- Sorting workstation
- 1 tote sorting conveyor workstation
- Storage capacity
- 3,580 tote positions and 70 pallet positions within 500 m²
- Cross-floor integration
- Automatic freight elevator coordination and ERP integration