Automated storage system on site
All case studies

Intelligent Metal Joining Equipment

HERON

Goods-to-Person Picking and Automated Assembly Line Supply

Guangzhou · Founded in 1991

Warehouse workforce optimization
30%
PTL tote delivery rateSingle-cycle operation
60totes/h
Conveyor tote delivery rateSingle-cycle operation
45totes/h

The challenge

Accurate kitting for varied assembly materials

Assembly requires complete kits drawn from a wide variety of materials. Material mix-ups and production line waiting are addressed through coordinated picking and delivery.

Pick-to-light picking area
Pick-to-light picking area

The solution

Goods-to-person picking and delivery across floors

CTUs, low-profile AGVs and pick-to-light workstations coordinate storage, picking and delivery. ERP and MES integration supports order-based material kitting for assembly.

Robotic material delivery
Robotic material delivery

Project configuration

Robots
3 CTUs and 5 low-profile AGVs
Workstations
3 pallet workstations, 3 tote workstations and 1 PTL workstation
Storage capacity
16,000 storage positions at a storage height of 4.5 m
Integration and supply
ERP and MES integration; order-based kitting for assembly